Sometimes I love being a base comission over flat rate. got an engine job that came in, I get a percentage of the final bill... the job is right around 3,000 But on that same token another job came in that will be around 600, and I have to try and juggle them both, as one is a camshaft/crankshaft seal replacement/timing belt/water pump job. And between me and water pumps on fwd cars... I tend to lose so far it's like water pump/timing belt 12 bryant 2 And it's storming really bad right now. So the power may be out for a couple of weeks Just thought I'd do some mindless rambling
pretty much standard winter here. As long as cullen doesn't chime in I can complain, but he has us all beat.
he has stated in the past that the power in cebu goes out quite frequently, often for long periods of time.